Doza Duo · DozaLink
Operation Manual
How to install, set up, run and maintain Doza at your car wash.
Planning an install Check power, Wi-Fi, wash signals and plumbing first.Installing a device Connect power and pumps, then join Wi-Fi.Changing a dose Adjust any site from dozalink.com.Something is wrong Find the symptom and the safe next step.
Plan and install
What Doza does, what the site needs, and how to install it.
- 1 How Doza works What the device does, what a complete installation includes, and the install order.
- 2 Check the site Mounting space, power, Wi-Fi, wash signals, and plumbing to have ready.
- 3 Mount, power, and plumb Mount the device, connect power, and run the chemical tubing.
- 4 Wire the wash signals Connect Relay 1 and Relay 2 to the wash controller outputs.
Connect
Join Wi-Fi and add the device to DozaLink.
Set up dosing
Set the tubing, prime, calibrate, and set up wash triggers or a schedule.
- 7 Tubing and pump direction Match each pump to its tubing and set which way it turns.
- 8 Prime and run a pump Fill the lines and run a pump by hand from the device or DozaLink.
- 9 Calibrate the pumps Measure a test dose and save the result so doses are accurate.
- 10 Set up wash triggers Choose which pump each signal runs and how much it doses.
- 11 Dose on a schedule Run a pump at set times on set days, with no wash signal.
Manage with DozaLink
Change doses, track chemicals and costs, and manage sites and people.
- 12 Change doses at any site Check device status and change doses from dozalink.com.
- 13 Chemicals and stock Add chemicals with their cost and keep stock levels current.
- 14 Usage and cost per car Read the dashboard, compare sites and chemicals, and download reports.
- 15 Sites, team, and billing Add locations, invite people, review changes, and manage the subscription.
Maintain
Replace tubing, update firmware, and fix problems.
Reference
Specifications and limits.
19 pages · Printable manual (all pages) · Questions: [email protected]
