Manual contents Mount, power, and plumb

Plan and install · Section 3

Mount, power, and plumb

Mount the device, connect power, and run the chemical tubing.

On the hardware

Mount

Fasten the enclosure through its four flange holes with #8 screws (hole pattern 187.3 × 88.9 mm, 7.375 × 3.500 in). Leave room to open both pump heads, and keep the device out of direct spray.

Connect power

Plug the power supply cable into the device’s power connector. One supply’s cable splits to power two devices. Plug the supply into the outlet last.

Run the tubing

Each pump needs a suction line from its chemical container and a delivery line to its injection point. Keep the lines free of kinks. To tell the lines apart, name each pump’s chemical in DozaLink or add a label to the line.

Which pump is which

Run each pump briefly from setup mode or DozaLink (Prime and run a pump) so you know which head is Pump 1 and which is Pump 2 before you connect the chemicals.